WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 2
Current filter: Finish Year is 2006 Click here to show all 243 jobs
Bellevue City Hall Project:
Bellevue City Hall was designed by SRG Partnership and built by Lease Crutcher Lewis Construction

Click image to see more.

Location: 450 110th Ave NE Bellevue, WA

Finish Year: 2006

Architect: SRG Partnership

General: Lease Crutcher Lewis Construction

Our design modifications helped shave several million dollars off the recladding of Bellevues new city hall. The siding is formed from .063 aluminum in two colors and several profiles.

Everett C.C. Arts and Science Building Project:
Everett C.C. Arts and Science Building was designed by LMN and built by Mortenson Construction

Click image to see more.

Location: 2000 Tower Street Everett, WA

Finish Year: 2006

Architect: LMN

General: Mortenson Construction

Here we installed Prodema (a wood composite product from Spain). The panel joints and fasteners were made to align with the window mullions. This one really stands out from the rest.

SNBL Addition Project:
SNBL Addition was designed by Gary Parkinson RA and built by

Click image to see more.

Location: 6605 Merrill Creek Parkway Everett, WA

Finish Year: 2006

Architect: Gary Parkinson RA

These panels are from Proclad. The .063 panels with stiffeners provide a very flat appearance and are all formed with lines in a grid.

Madison Tower Project:
Madison Tower was designed by Weber Thompson and built by Murray Franklyn

Click image to see more.

Location: Seattle, WA

Finish Year: 2006

Architect: Weber Thompson

General: Murray Franklyn

713 State Street Residence Project:
713 State Street Residence was designed by Craig Szweda, Six Drafting and built by Sullivan Custom Homes

Click image to see more.

Location: Kirkland, WA

Finish Year: 2006

Architect: Craig Szweda, Six Drafting

General: Sullivan Custom Homes

This home, designed by Owner Designer Faye Torgerson and architect Craig Sweda features plate metal siding inside and out, as well as formed, rectangular concealed fastener panels.

Bush School Phases 2A and 2B Project:
Bush School Phases 2A and 2B was designed by Miller Hull and built by GLY Construction

Click image to enlarge.

Location: Seattle, WA

Finish Year: 2006

Architect: Miller Hull

General: GLY Construction

This Project features AEP Spans Zactique roofing and siding. Miller Hull made nice use of lines and textures to create a great looking building.

Good Samaritan Hospital Project:
Good Samaritan Hospital was designed by Clark Kjos and built by Howard S Wright Construction

Click image to see more.

Location: 407 14th Ave. SE Puyallup, WA

Finish Year: 2006

Architect: Clark Kjos

General: Howard S Wright Construction

Goat Hill Garage Project:
Goat Hill Garage was designed by Zimmer Gunsul Frasca and built by Turner Construction

Click image to see more.

Location: 401 5th Ave Seattle, WA

Finish Year: 2006

Architect: Zimmer Gunsul Frasca

General: Turner Construction

Note: Although we did not install the graphics on this particular job, we have a CNC machine and can cut any graphic you desire.

Current filter: Finish Year is 2006 Click here to show all 243 jobs
©2014 Northshore
Close X
Loading...