Click image to see more.
Location: 604 Bellevue Way NE Bellevue, WA
Finish Year: 2005
Architect: Sclater Partners
General: Skanska Construction
Lincoln Square features over 40k square feet of composite siding panels, in three colors. The panels were provided by Centria. NSSM shop drawings helped manage the dimensions between trades for this fabulous looking building in Bellevue.
Click image to see more.
Location: 4500 26th Ave. NE. Seattle, WA
Finish Year: 2005
Architect: GGLO
General: Lease Crutcher Lewis Construction
What can we say? The gray siding is Zinc. Everybody loves the matte look, the texture and the ability to be curved.
Click image to enlarge.
Location: 604 Bellevue Way NE Bellevue, WA
Finish Year: 2005
Architect: Sclater Partners
General: Skanska Construction
Northshore simultaneously performed the sheet metal siding on the hotel and retail portions of Lincoln Square during the installation of the composite panels. Three separate profiles of siding were implemented.
Click image to see more.
We installed the custom color AEP Prestige siding and the solid aluminum cladding, including the cut out ARTS sign. We have the ability to include CNC machine patterns, logos or letters into your design.
Click image to see more.
Location: 403 Ramsay Way Kent, WA
Finish Year: 2005
Architect: Callison
General: Lease Crutcher Lewis Construction
Northclad ACM panels, formed using Citadel composites RS system provide a clean look. Several colors were implemented here.
Click image to enlarge.
Location: 110 E. Third st. Arlington, WA
Finish Year: 2005
Architect: Schreiber and Lane
General: CDK construction
VM Zinc flush panels we fabricated in our shop are punctuated by horizontal accent bands.
Click image to enlarge.
Location: 2402 Auburn Way S. Auburn, WA
Finish Year: 2005
General: Lease Crutcher Lewis Construction
This awning features Citadel composite panels with an anodized finish. The columns are from Unaclad, and we provided the custom spun column tops.
Click image to enlarge.
Location: 12501 28th Ave Ne Seattle, WA
Finish Year: 2005
Architect: ARC
General: Bayley Construction
AEP siding combined with custom flashing make this building look like a proper civic center.