WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 1
Current filter: General is Sierra Construction Click here to show all 243 jobs
Alderwood Parkway Phase II Project:
Alderwood Parkway Phase II was designed by CDA and built by Sierra Construction

Click image to see more.

Location: 19230 Alderwood Mall Parkway Lynwood, WA

Finish Year: 2005

Architect: CDA

General: Sierra Construction

This project consisted of Citadel Composite panels, gridded out and in wedge shapes. The metal roofs were from AEP Span.

Mukilteo Water District Project:
Mukilteo Water District was designed by Driftmier and built by Sierra Construction

Click image to see more.

Location: 7824 Mukilteo Speedway Mukilteo, WA

Finish Year: 2002

Architect: Driftmier

General: Sierra Construction

We did the building closest to the road with AEPs Klip Rib. This is a structural panel with concealed fasteners. We installed our industrial gutter.

Current filter: General is Sierra Construction Click here to show all 243 jobs
©2014 Northshore
Close X
Loading...