Click image to see more.
Location: 19230 Alderwood Mall Parkway Lynwood, WA
Finish Year: 2005
Architect: CDA
General: Sierra Construction
This project consisted of Citadel Composite panels, gridded out and in wedge shapes. The metal roofs were from AEP Span.
Click image to see more.
Location: 7824 Mukilteo Speedway Mukilteo, WA
Finish Year: 2002
Architect: Driftmier
General: Sierra Construction
We did the building closest to the road with AEPs Klip Rib. This is a structural panel with concealed fasteners. We installed our industrial gutter.