Lakewood Commuter Rail Station Project:
Lakewood Commuter Rail Station was designed by Hewitt and built by PCL Construction

Click image to see more.

Location: Lakewood, WA

Finish Year: 2008

Architect: Hewitt

General: PCL Construction

We supplied the frame system with custom extrusions unique to this project and perforated metal bar grating on this project. Unfortunately, our supplier, McNichols,delayed the project by mis-producing the bar grating. We did our best to minimize the impact on PCL and the rest of the parties. Today the garage is open and looks great.

York Pumping Station Project:
York Pumping Station was designed by Harris and Associates and built by PCL Construction

Click image to see more.

Location: 14120 NE 124th St Redmond, WA

Finish Year: 2005

Architect: Harris and Associates

General: PCL Construction

We did both phases of the York buildings. These pump stations look extremely classy. The latest featured siding from Unaclad and stainless steel hoods.

IDX Tower Project:
IDX Tower was designed by Kendall Heaton Associates and built by PCL Construction

Click image to enlarge.

Location: 950 3rd Avenue Seattle, WA

Finish Year: 2003

Architect: Kendall Heaton Associates

General: PCL Construction

We performed flashing for the roof.

Seatac Control Tower Project:
Seatac Control Tower was designed by URS Greiner and built by PCL Construction

Click image to enlarge.

Location: 2440 S. 166th St Seatac, WA

Finish Year: 2002

Architect: URS Greiner

General: PCL Construction

We did the Centria Formawall siding up top and the stainless flashing down at the base building.