WA Phone: (425) 487-1111 HI Phone: (808) 284-9042

Navigation:
Popular:
< Prev Next > Page 1 of 1
Current filter: General is Bayley Construction Click here to show all 243 jobs
Seahawks Practice Facility Project:
Seahawks Practice Facility was designed by Crawford Architects and built by Bayley Construction

Click image to see more.

Location: Seattle, WA

Finish Year: 2008

Architect: Crawford Architects

General: Bayley Construction

Lake City Civic Core Project:
Lake City Civic Core was designed by ARC and built by Bayley Construction

Click image to enlarge.

Location: 12501 28th Ave Ne Seattle, WA

Finish Year: 2005

Architect: ARC

General: Bayley Construction

AEP siding combined with custom flashing make this building look like a proper civic center.

Lynnwood Transit Center Project:
Lynnwood Transit Center was designed by Zimmer Gunsul Frasca and built by Bayley Construction

Click image to enlarge.

Location: 20121 48th Avenue West Lynwood, WA

Finish Year: 2003

Architect: Zimmer Gunsul Frasca

General: Bayley Construction

The transit center features curved metal roofing from AEP, as well as solid aluminum siding panels on the buildings. The aluminum was fabricated in our shop, including welded corners.

White River High School Project:
White River High School was designed by Integrus and built by Bayley Construction

Click image to enlarge.

Location: 26928 120th St E Buckley, WA

Finish Year: 2003

Architect: Integrus

General: Bayley Construction

We took this over when one of our competitors went out of business. The building features lots of metal roofing and siding adn some stainless gutters.

Issaquah Bank Expansion Project:
Issaquah Bank Expansion was designed by Baylis and built by Bayley Construction

Click image to enlarge.

Location: 1055 NW Maple St. Issaquah, WA

Finish Year: 2003

Architect: Baylis

General: Bayley Construction

Nice flashing.

SeaTac Airport Station Project:
SeaTac Airport Station was designed by Hatch Mott MacDonald and built by Bayley Construction

Click image to see more.

Location: SeaTac Airport SeaTac, WA

Finish Year: 2009

Architect: Hatch Mott MacDonald

General: Bayley Construction

Current filter: General is Bayley Construction Click here to show all 243 jobs
©2014 Northshore
Close X
Loading...